• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
HPC logo

Hydropressure Cleaning, Inc.

WellJet • DrumJet • ConJet

  • Home
  • Services
  • Value Proposition
  • Projects
  • Videos
  • About
  • Contact Us
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.

Oroville Dam Emergency Spillway Repair on Existing Terminal Structure and Chute Blocks

HPC was retained to support emergency repairs associated with the Oroville Dam Emergency Repair Project. The scope of the project involved the removal of concrete to a depth of 14” to 16” from the Dam Spillway at the Terminal Structure including Chute Blocks, Terminal Walls, Slab, and Ramp. HPC and its subcontractors worked around the clock with multiple robots – project challenges included extremely high strength concrete, oversize aggregate, and use of recycled water. HPC completed 82 days of hydrodemolition removal, with final surface preparation achieved through mechanical removal to meet schedule requirements.

photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Oroville Dam Emergency Spillway Repair Conjet project
photo of Eshidiya flow
photo of Oroville Dam Emergency Spillway Repair Conet project
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
photo of Oroville Dam Conjet project from Hydropressure Cleaning, Inc.
Oroville Dam spillway damage 27 Feb 2017

Draw down and cut off of releases from the damaged spillway at Oroville Dam. Taken on Feburary 27, 2017. Dale Kolke/California Delpartment of Water Resources.

20180416_182121_001-scaled
20180405_072734-scaled
20180531_062854-1-1
20180531_105903-scaled
20180504_120211-scaled
20180511_054818-scaled.
0180519_081621-scaled
20180515_070831-scaled
16802986_20180615_012306_1277947-scaled
20180531_082859-scaled
20180510_030835-scaled
20180509_035833-scaled
20180605_104743-scaled
20181015_132959-scaled
20181015_132701-scaled
previous arrow
next arrow
Back To Projects
Project: Conjet

Get a quote: (800) 934-2399

Contact Us For A Quote

Corporate Office

413 Dawson Drive
Camarillo, CA 93012

info@hydropressure.com

Tel: (800) 934-2399

Fax: (805) 388-0423

Get In Touch

Contact Us

Get A Quote

About Us

Privacy Policy

Services

WellJet

Conjet

DrumJet

Featured Projects

Library

Case Studies

Projects

Videos


Return to top

Copyright © 2023 Hydropressure Cleaning, Inc. • website by Webb Weavers Consulting