Rehabilitation of I-5 / I-210
Bridge Deck
HPC employed its Conjet 363 Hydrodemolition Robot to remove 4 – 6 inches of concrete surfacing from overpass bridge decking at the I-5 / I-210 Interchange located in Sylmar, CA. The project involved night-time removal of a total of 450 CY of material. HPC completed the work with several mobilizations to facilitate removal and repair of sections of lanes with quick-set concrete.